Projects Delivered Across Canada

Our project experience spans a wide range of industries and environments across Canada. From active industrial facilities to remote and high-risk sites, each project reflects our ability to plan, adapt, and execute safely. See a few of our recent projects below.

Buildings & Infrastructure

Fire Spray Foam Removal
 
Fire Spray Foam Removal

Industry & Services

  • Hazardous Materials Abatement
  • Commercial

Outcome

  • Currently on time and on budget to be completed in 2026
  • Hazardous waste bag count, estimated to be 75,000 units
Client Food Distribution Warehouse
Location Calgary, Alberta
Project Year(s) 2026

Project on schedule to meet the ten-month timeline. Work conducted with third party environmental consultant.

Scope

  • Removal of asbestos containing fire spray foam insulation from 154,000 s.f. of Q Deck and piping
  • Warehouse shelving remains in place
  • Poly wrap all walls, floors, walk-in coolers, interior equipment and piping, to prevent contamination
  • High-Risk containment, with up to 10 negative air units, with removal by grinding, scraping and blasting
  • Provide decontamination facilities and showers
  • Work being completed in phases
  • Work areas include Q Deck roofing in the mechanical room, cooler area, mezzanine area, warehousing area, loading dock and the main entrance way
  • Rebuild structural framing & platform above coolers
  • Crew size of between 10 and 30 certified workers
Major Airport Authority - Main Concourse Restoration
 
Major Airport Authority - Main Concourse Restoration

Industry & Services

  • Hazardous Materials Abatement
  • Infrastructure Other

Outcome

  • Project started in August 2025 and completed in April 2026
Client Major Airport Authority
Location Western Canada

Bravura’s multiple skill set, allowed it to safely complete the abatement project while at the same time assisting other sub-trades working within the Main Concourse restricted area, to ultimately meet the client’s overall schedule.

Scope

  • A component of the Main Concourse Restoration Project, resulting from 2024 Hailstorm
  • Replacement of the DTB Roof on Main Concourse
  • Removal and disposal of asbestos containing roof material
  • Install 55,000 s.f. of roof levelling concrete
  • Lead paint and fireproofing materials removal
  • Adjusted daily labour supply to match General Contractors changing environment, while maintaining budget
  • Coordination and planning with General Contractor and other sub-trades to maximize production safety and minimize disruption to YYC Operations
Calgary Government Building
 
Calgary Government Building

Industry & Services

  • Abatement & Demolition
  • Commercial Building

Outcome

  • Project completed in high traffic and very visible downtown area
  • Project was delivered without incident, on budget and within an extremely tight schedule
Client Confidential Government Building
Location Calgary, AB, Canada

Bravura partnered with Consultants and a General Contractor to deliver the Project efficiently and effectively. The client acknowledged excellent project execution.

Scope

  • Removal & Disposal of Asbestos Containing Materials
  • 4-Storey Concrete Government Building Abatement Clean Demolition
  • Abatement & Demolition of Elevator & Duct Shafts
  • Floor Grinding and T-Bar Grinding
  • Mastic, Ceiling Tiles, Duct Insulation, Vinyl Tiles
  • Hazardous Materials included Asbestos and PCB Ballasts
  • Developed a Comprehensive Health & Safety and an Environmental Management Plan
  • Spill Response Plan
  • Community Communication & Traffic Management Plan

Energy & Natural Resources

Uranium Mine Abandonment
 
Uranium Mine Abandonment

Industry & Services

  • Abatement & Demolition
  • Mining Industry

Outcome

  • Project was delivered without incident, ten (10) months ahead of schedule.
Location Northern Saskatchewan, Canada

First Nations consultation and employment and achieved IOC workforce content of 62% and training and employment for 100 residents. Client acknowledgement of excellent project execution.

Scope

  • Develop Comprehensive Health & Safety Plan
  • Radiation Protection Plan
  • Environmental Management Plan
  • Spill Response Plan
  • Community Communication Plan
  • Demolition Execution Plan
  • Asbestos, Transite Panels, PCB’s, Mercury
  • Hazardous Materials Classification & Removal
  • Removal of nine (9) Buildings
  • Abatement and Implosion of 170-foot Head Frame
  • Removal of 16,000 lineal feet of utilidors
Major Oil Company
 
Major Oil Company

Industry & Services

  • Asbestos Abatement
  • Oil & Gas Industry

Outcome

  • Project delivered successfully with zero safety incidents
  • Project Value $1,150,000
Client Major Oil Company
Location NWT, Canada

Completed work in an operating plant, under special access procedures.

Scope

  • The Norman Wells facilities have been in crude oil production since the 1920’s
  • The Norman Wells crude oil and off gas production facility, is being decommissioned
  • Successfully planned and delivered manpower and equipment Logistics to remote northern location
  • Managed a strong team environment with IOL and environmental consulting (partner)
  • Bravura completed a complex asbestos abatement project on 31 Modular Work Platforms in 2021
Central Alberta Gas Processing Complex
 
Central Alberta Gas Processing Complex

Industry & Services

  • Asbestos Abatement
  • Oil & Gas Industry

Outcome

  • Project was completed, on schedule and within budget
  • Project was completed safely with no incidents
Client Central Alberta Gas Processing Complex
Location Central Alberta, Canada
Project Year(s) 2025

Several abatement projects were completed with Brand Energy Solutions at the Central Alberta Gas Processing Complex.

Scope

  • Partnered with Alberta Oilfield Maintenance Contractor, for annual asbestos insulation removal program
  • Containment, removal and disposal of asbestos insulation from De-Aerator Tower
  • Removal & disposal of cladding & asbestos insulation from vessels of varying sizes
  • Utilized High Risk and Glove Bag procedures
  • In 2025 provided medium risk testing access to 200-foot vessel utilizing a crane and man-basket
  • Work conducted in fully operational gas processing plant, in restricted space, with H2S processing
  • Working at heights with Crane Man Basket & Scaffolding
  • Daily on-site work management & spill protection plans required
Gold Mine Decommissioning
 
Gold Mine Decommissioning

Industry & Services

  • Abatement
  • Waste Management
  • Demolition
  • Mining Industry

Outcome

  • Ongoing 3-year project, currently on target for completion by 2027
Location Canada's Northern Region
Project Year(s) 2025, 2026 & 2027

Provided comprehensive waste management and demolition support focused on hazardous and recyclable waste reduction, cost-effective hybrid abatement and demolition solutions, and full waste compliance tracking. Delivered consistent daily, weekly, and monthly reporting alongside proactive community communication, while maintaining strong partnerships with First Nations, waste management providers, and heavy demolition contractors.

Scope

  • Develop a detailed Construction, Environmental Management, Health & Safety and Risk Mitigation Plans
  • Inspection all building for structural integrity, including 3D laser scans, and provide underpinning, bracing, shoring, & sealants as required, prior to demolition
  • Developed site specific Abatement, Air Monitoring, Decontamination Policies
  • Developed site specific procedures for waste containment, consolidation, classification, removal, transport & disposal
  • Containment, removal & abatement for arsenic, asbestos, cyanide, lead, mercury, & PCB waste materials
  • High, Medium & Low Risk Abatement
  • Supply personnel decontamination facilities c/w clean and dirty locker areas and secure showers
  • Prepare site specific arsenic, cyanide, NORM, and explosives management plans
  • Develop site specific plans for erosion control & sedimentation, water management, spill response, borrow materials, traffic, dust control, and wildlife management
Fox Creek Area Power Plant
 
Fox Creek Area Power Plant

Industry & Services

  • Asbestos Abatement
  • Selective Demolition Services
  • Process Facility

Outcome

  • Project was completed, on schedule and on budget
  • Project was completed safely with no incidents
Client Confidential Owner
Location Fox Creek, Alberta, Canada
Project Year(s) 2022

Developed a Strategic Plan with the client, consultant and subcontractors to design temporary structures and containments for ongoing plant accessibility, while adhering to legislative and safety regulatory requirements.

Scope

  • Work at a new 33 MW Cogeneration Power Plant developed by an Alberta Midstream Company.
  • At former site of Kaybob 3 Sour Gas Plant
  • Partnered with an Alberta based Oilfield Maintenance Contractor
  • Multiple project phases at various locations throughout the plant for abatement & selective demolition services
  • High risk enclosures for removal & disposal of metal cladding and asbestos containing insulation from various size (original) plant vessels
  • Removal of asbestos containing insulation from elevated, above ground pipe runs
  • Requirement for Working at Heights, utilizing scaffolding and manlifts

Healthcare & Institutional

Saskatchewan Hospital
 
Saskatchewan Hospital

Industry & Services

  • Mould Abatement
  • Selective Demolition
  • Restoration
  • Healthcare Industry

Outcome

  • Successful coordination with all contractors on site
  • Project was delivered without incident, ten (10) months ahead of schedule
Client Provincial Health Authority
Location Saskatchewan, Canada

Project was completed with no incidents, and minimal disruptions to an Operating Facility. The client acknowledged excellent project execution.

Scope

  • Several Hundred Bed Facility, opened March 2019
  • Work was conducted while the facility was in full operation
  • Selective Demolition & Mould Abatement in 2019/2020
  • Removal & disposal of wet ceilings, floors, walls, backing, and insulation
  • Work in common areas, therapy room, nurses station, ICP room and Telecommunication room
  • Work included soft & hard hoardings, & scaffolding
  • Ongoing coordination to ensure ongoing needs of primary staff
  • Work under High, Medium, Low and Minimal levels of security
  • Included entry & exit inspections for inventory of materials, equipment, tools, & waste volumes
  • Develop and comply with infectious work plans

Industrial & Manufacturing

Central Alberta Water Treatment Plant
 
Central Alberta Water Treatment Plant

Industry & Services

  • Selective Demolition
  • Process Facilities

Outcome

  • As-Built Drawings were prepared by Bravura and approved by the General Contractor
Client Municipal Authority
Location Central Alberta, Canada

The project was completed while the Water Treatment Plant remained fully operational, with work continuing through winter under extensive hoarding and heating. Working alongside the General Construction Contractor, our team coordinated daily with other trades to ensure safe, efficient progress. Despite the challenges of an active facility and harsh seasonal conditions, Train 1 was completed on schedule in 2020, followed by Train 2 in 2021. We also exceeded the Town’s Environmental Plan requirements, maintaining exceptional standards for damage prevention, dust control, and debris management.

Scope

  • Supply all resources, planning and engineering for the abatement and demolition of the Three Hills WTP
  • Removal & disposal of lead paint and paint contaminated demolished items & debris
  • Demolition of flocculation basin cells to increase size and treatment capability, in an active plant
  • High Risk environment required use of demolition robots and remote-controlled saws to deconstruct 12” walls
  • Portable gantry cranes were utilized to remove concrete debris and rubble from the flocculation basins
  • Removal & disposal chemical building concrete floor
  • Cut openings up to 3 feet in diameter and through 18 inch concrete walls for filter gallery and HVAC utilities
  • Flush cut all concrete edges on walls and floors
  • Establish site specific, quality control, environmental and safety programs
Insect Farm Demolition & Rebuild
 
Insect Farm Demolition & Rebuild

Industry & Services

  • Interior Demolition & Concrete Cutting
  • Manufacturing

Outcome

  • Delivered this significant project on budget in 4 months
Client Property Development Group
Location Southern Alberta

As General Contractor, met airborne dust and noise control plans, supervised sub trades, completed the project safely while managing numerous sub-contractors

Scope

  • The decommissioning of this 17,000 m2 insect farm, food and fertilizer manufacturing facility
  • Demolition crew consisted of 12 to 20 certified workers
  • Sanitize and odour mitigation of this facility
  • Isolation of electrical source and removal of components & wiring, on walls, ceilings, and internal equipment
  • Removal of all walls, partitions, IMP panels, hatchery pods, walls, mezzanine, stairs, ceilings, shutters, glazing, & overhead doors
  • Concrete cutting, breaking & edge grinding for slabs, tank area, curbs, pads, walls, sloped ramps and trenching
  • Removal of all HVAC, roof top dog houses, ventilators, fans, air handling units, air conditioners, and associated piping
  • Removal of security fence, gates, steel structures, offices, furniture and equipment

Public Sector & Communities

Major Bank Chain - Typical Retrofit
 
Major Bank Chain - Typical Retrofit

Industry & Services

  • Abatement & Demolition
  • Public Sector

Outcome

  • Delivered this complex project on schedule, in an operating strip mall, in eight (8) weeks
Client Major Bank Chain
Location Calgary, AB
Project Year(s) 2026

Multiple Projects exceeding a total value of $1,000,000 with a major Canadian Bank chain.

Scope

  • This is an overview of one major project with selective and vault demolition in an operating mall completed in 2026. Bravura has completed nine projects, for this group.
  • Contractor Employees to possess Security Clearance with a crew size of 5 to 20 waste technicians
  • Work areas included High, Medium and Low Risk, containment, decontamination area, and negative air
  • Isolation of electrical and air supply from mall and seal all breaches within the work area
  • Interior demolition includes ceiling tiles, carpet, floor tiles, floor glue, partitions, glass, HVAC ducting, insulation, wiring, conduit, and lighting fixtures
  • Asbestos containing materials included dry wall, floor tiles, ceiling tiles, insulation and mastic tape removal and packaging into over 2,500 asbestos (yellow) bags
  • Demolition and removal of concrete vault
  • Equipment utilized included a tile removal machine, standing mini skid steers and a demolition robot